View Single Post
Old 05-08-2013, 01:50 PM   #11
rbrandes
Member (4 bit)
 
Join Date: May 2013
Posts: 8
glc,
I will be running SW2012 Preimum which I can get for $200. Just like AutoCad, SW has gone beyond the 80/20 ratio of what it has vs what you use.
Right now I have SW 2010 and there is too much there for my engineering needs.
I trained AutoCad Designer, ProE, ProJr and was in on SolidWorks when it was still beta. Must have sold a couple hundred seats when a demo jock in Georgia.
Regards, Ray

PS: I have my build in my in basket at newegg and with keyboard, mouse and monitor it comes in at $1,482.88 Thank you for leading the way.
BTW, will I be needing any cables, heat sink grease or anything else that will halt the assembly?

Last edited by rbrandes; 05-08-2013 at 01:53 PM.
rbrandes is offline   Reply With Quote